行业采购解决方案 · 审核日期 31 July 2026

Steel for Oil, Gas, and Pipeline Projects

Oil and gas steel procurement begins with fluid composition, pressure, temperature, fracture control, sour-service risk, corrosion management, joining, inspection, and the governing piping or pipeline code.

01 服役环境02 系统要求03 规范与文件04 检验与交付

首先确认

整个项目不存在一份通用的金属材料规范

应先把项目拆分为不同系统,记录各自服役环境和适用规范,再选择相互兼容的材料、产品标准、加工路线、防护体系与检验计划。

01服役环境

Dry gas, wet gas, crude, refined products, water injection, chemicals, and multiphase service

02服役环境

Internal pressure, cyclic operation, temperature extremes, fracture-control, and geohazard loads

03服役环境

CO2, H2S, chlorides, microbiological activity, external soil or marine exposure, and under-insulation conditions

系统选材图

按项目系统选择材料与产品

系统选材因素与备选方案经审核的起始方案
Transmission and gathering line pipe
  • Specify line-pipe grade, PSL, dimensions, toughness, fracture-control, manufacturing route, and required supplementary tests.
  • Sour or offshore service requires project and code-specific metallurgy, hardness, testing, coating, and documentation.
Carbon steel pipeAlloy steel
Process piping
  • Material class must align pipe, fittings, flanges, bolting, welding, corrosion allowance, and pressure-temperature rating.
  • Fluid chemistry and temperature control whether carbon, low-alloy, stainless, or lined systems are evaluated.
Stainless pipeCarbon steel pipe
Pressure equipment
  • Plate grade, thickness, heat treatment, toughness, forming, welding, NDE, and code documentation are interdependent.
  • A pressure-vessel plate grade is not accepted without the governing construction code and design conditions.
A516 Grade 70Carbon steel plate
Structures, supports, and pipe racks
  • Coordinate structural loads, fireproofing, low-temperature toughness, coating, and interface with piping movement.
  • Structural grades and delivery conditions follow the project design code and environment.
ASTM A36A572 Grade 50
Tanks and corrosion-control systems
  • Define stored product, bottom and roof exposure, settlement, welding, lining, coating, and inspection.
  • Cathodic protection, coatings, inhibitors, monitoring, and corrosion allowance must be designed as a system.
Carbon steel plate316L

项目控制

标准、认证与文件

  • Applicable ASME B31 pipeline or process-piping code and project piping classes
  • API line pipe, tank, pressure-equipment, and inspection standards as applicable
  • Design basis, fluid composition, corrosion study, materials selection report, and line list
  • Welding procedures, qualification records, NDE plan, pressure-test package, and coating specification
  • Material certificates, supplementary-test results, traceability, and manufacturing record book

制造与物流

需要控制的供货接口

  • 制造图、焊接、热处理、涂层与修补程序
  • 检验见证点、试验方法、验收准则与文件批准
  • 下料和组装全程标识、防护、包装与集运
  • 目的地要求、现场储存、安装接口与交付顺序

风险清单

常见采购风险

01

Omitting sour-service, fracture-control, low-temperature, or supplementary-test requirements from the purchase order

02

Treating pipe, fittings, flanges, bolting, weld metal, and coating as unrelated purchases

03

Accepting grade substitutions without code, wall-thickness, toughness, weldability, and corrosion review

04

Loss of traceability or inconsistent document requirements across mills, fabricators, and package vendors

可比报价

结构化询价清单

01询价输入

Project location, service environment, design life, and governing codes

02询价输入

System or component, material grade, and governing product specification

03询价输入

Dimensions, tolerance, quantity, and delivery lot sequence

04询价输入

Condition, finish, coating, corrosion allowance, or cathodic-protection interface

05询价输入

Welding procedure, fabrication, heat treatment, and qualification requirements

06询价输入

Inspection and test plan, acceptance criteria, certificates, and third-party hold points

07询价输入

Marking, traceability, packing, preservation, and destination

08询价输入

Required delivery date, shipment terms, and approved-vendor constraints

证据

来源与审核

项目工程文件和当前适用规范优先于本页的一般选材建议。

从中国采购项目材料

建立可追溯的 Oil, gas & pipelines 供货包

请提供设计依据、系统清单、技术规范、数量、检验计划、目的地与交付计划。

讨论项目