Metals for Aerospace Manufacturing
Aerospace metal procurement must conform to approved design data, material specification, condition, lot traceability, special-process controls and inspection route. A recognized alloy or mill certificate does not by itself authorize flight hardware, replacement parts or spacecraft use.
Answer first
There is no single metal specification for an entire project
Divide the project into systems, document each service environment and governing code, then select compatible materials, product standards, fabrication routes, protection systems and inspection plans.
Approved configuration, material/temper condition, traceability and supplier-quality controls
Static, fatigue, vibration, temperature, corrosion and damage-tolerance conditions defined by the design
Machining, forming, joining, special process, handling and contamination controls
System map
Material and product selection by project system
| System | Selection drivers and alternatives | Reviewed starting points |
|---|---|---|
| Structure and machined components |
| Aluminum sheet & plate |
| Interior, ground-support and non-flight equipment |
| Stainless sheetAluminum sheet & plate |
| Tubing and fluid interfaces |
| Stainless pipe |
| Receiving inspection and traceability |
| Aluminum sheet & plateStainless sheet |
Project control
Standards, certification and documents
- Approved design data, part drawing, material specification and applicable customer/regulatory requirements
- Material/temper certification, lot traceability, special-process and inspection records
- Conformance, nonconformance and configuration-change documentation
Fabrication and logistics
Package interfaces to control
- Fabrication drawings, welding, heat treatment, coating and repair procedures
- Inspection hold points, testing methods, acceptance criteria and document approval
- Identification through cutting and assembly, preservation, packing and consolidated shipping
- Destination rules, site storage, installation interfaces and delivery sequence
Risk register
Common procurement risks
Equating alloy name or MTR with flight authorization
Mixing approved and commercial material lots or losing traceability after cutting
Changing condition, special process or supplier without design-authority approval
Comparable offers
Structured RFQ checklist
Approved design authority, classification, governing code and supplier-approval status
Exact part/product form, material specification, condition, dimensions and configuration identification
Traceability, certificates, test records, inspection hold points and change-control requirements
Fabrication, special process, packaging, preservation, destination and delivery-document requirements
Evidence
Sources and review
Project engineering documents and current governing standards supersede this general selection map.