Metals for Heat Exchangers

Heat-exchanger metal selection is governed by both sides of the exchanger: fluid chemistry, chlorides, pressure, temperature, velocity, fouling, crevices, thermal cycling and fabrication. Selecting tube or plate by grade name alone can create a hidden failure point.

01 Service environment02 System requirements03 Codes & documents04 Inspection & delivery

Answer first

There is no single metal specification for an entire project

Divide the project into systems, document each service environment and governing code, then select compatible materials, product standards, fabrication routes, protection systems and inspection plans.

01Service environment

Differential temperatures, pressure boundaries and thermal expansion

02Service environment

Cooling water, process fluids, deposits, chlorides and cleaning chemicals

03Service environment

Vibration, erosion, crevices and mixed-metal interfaces

System map

Material and product selection by project system

SystemSelection drivers and alternativesReviewed starting points
Tubes and tubular bundles
  • Specify tube standard, grade, dimensions, finish, eddy-current/NDE needs and tube-sheet interface.
  • Verify the ordered standard, dimensions, fabrication route, inspection and traceability before release.
Stainless pipe316L
Shells, channels and plates
  • Match pressure code, material class, thickness, corrosion allowance, forming and weld controls.
  • Verify the ordered standard, dimensions, fabrication route, inspection and traceability before release.
Carbon steel plateStainless sheet
Supports and external corrosion control
  • Separate internal-fluid compatibility from external condensation, atmosphere, insulation and drainage.
  • Verify the ordered standard, dimensions, fabrication route, inspection and traceability before release.
Galvanized coilStainless sheet
Inspection and documentation
  • Define PMI, weld map, pressure test, NDE, cleanliness and turnover requirements before fabrication.
  • Verify the ordered standard, dimensions, fabrication route, inspection and traceability before release.
Stainless pipeCarbon steel plate

Project control

Standards, certification and documents

  • Process data sheet for both fluids, pressure, temperature and fouling duty
  • Equipment drawings, code basis, material class and corrosion review
  • Tube/plate specifications, welding and examination procedures
  • Certificates, PMI, pressure test and final inspection dossier

Fabrication and logistics

Package interfaces to control

  • Fabrication drawings, welding, heat treatment, coating and repair procedures
  • Inspection hold points, testing methods, acceptance criteria and document approval
  • Identification through cutting and assembly, preservation, packing and consolidated shipping
  • Destination rules, site storage, installation interfaces and delivery sequence

Risk register

Common procurement risks

01

Selecting only from one fluid side

02

Ignoring deposits, crevices, velocity or cleaning chemistry

03

Ordering tube without tube-sheet and weld compatibility

04

Confusing corrosion allowance with erosion or fouling allowance

Comparable offers

Structured RFQ checklist

01RFQ input

Project location, governing code, service environment and design life

02RFQ input

System duty, material/product standard, grade and delivery condition

03RFQ input

Dimensions, tolerances, quantity, fabrication and welding requirements

04RFQ input

Inspection plan, test documents, marking, traceability and delivery destination

05RFQ input

Packing, preservation, shipping terms and required delivery date

Evidence

Sources and review

Project engineering documents and current governing standards supersede this general selection map.

Project sourcing from China

Build a traceable Heat exchangers supply package

Share the design basis, system list, specifications, quantities, inspection plan, destination and delivery schedule.

Discuss the project