Metals for Pressure Vessels

Pressure-vessel procurement ties the construction code, design conditions, allowable stress, material specification, thickness, toughness, corrosion, forming, welding, heat treatment, NDE and certification into one controlled package.

01 Service environment02 System requirements03 Codes & documents04 Inspection & delivery

Answer first

There is no single metal specification for an entire project

Divide the project into systems, document each service environment and governing code, then select compatible materials, product standards, fabrication routes, protection systems and inspection plans.

01Service environment

Internal or external pressure with design and minimum metal temperatures

02Service environment

Corrosive, sour, hydrogen, chloride or cyclic process service

03Service environment

Thick-section forming, restrained welding, heat treatment and examination

System map

Material and product selection by project system

SystemSelection drivers and alternativesReviewed starting points
Shells, heads and cones
  • Select code-listed material, thickness range, delivery condition, toughness and corrosion allowance from the design calculation.
  • Plate grade alone does not establish allowable stress, joint efficiency or formed-head acceptance.
Carbon steel plateStainless sheet
Nozzles, flanges and attachments
  • Match material class, pressure-temperature rating, reinforcement, weld detail and impact-test requirements.
  • Control local loads and dissimilar-metal welds through approved drawings and procedures.
Carbon steel pipeStainless pipe
Welding and heat treatment
  • Qualify procedures, personnel, consumables, preheat, interpass and postweld heat treatment for the code and material.
  • Forming strain and heat-treatment history must remain traceable to each pressure part.
Carbon and structural steelStainless steel
Inspection, testing and certification
  • Define authorized inspection, NDE method and extent, pressure test, marking and data report before purchase.
  • Mill certificates do not replace code traceability, fabrication records or final certification.
Carbon steel plateStainless sheet

Project control

Standards, certification and documents

  • Governing construction code, edition, jurisdiction and certification mark
  • Design pressure, temperature, MDMT, fluid, corrosion allowance and load cases
  • Material specifications, drawings, calculations, WPS/PQR, NDE and heat-treatment procedures
  • Material records, traceability map, inspection releases, test report and manufacturer data report

Fabrication and logistics

Package interfaces to control

  • Fabrication drawings, welding, heat treatment, coating and repair procedures
  • Inspection hold points, testing methods, acceptance criteria and document approval
  • Identification through cutting and assembly, preservation, packing and consolidated shipping
  • Destination rules, site storage, installation interfaces and delivery sequence

Risk register

Common procurement risks

01

Buying nominal plate before code material and thickness acceptance is confirmed

02

Omitting low-temperature toughness, sour service or postweld heat treatment

03

Substituting similar chemistry across specifications without code approval

04

Losing traceability during cutting, forming, weld repair or subcontract heat treatment

Comparable offers

Structured RFQ checklist

01RFQ input

Project location, service environment, design life and governing codes

02RFQ input

System or component, selected material and governing product specification

03RFQ input

Dimensions, tolerances, quantity and required delivery sequence

04RFQ input

Condition, finish, metallic coating, paint system or corrosion allowance

05RFQ input

Fabrication, forming, welding, heat treatment and qualification requirements

06RFQ input

Inspection and test plan, acceptance criteria, certificates and hold points

07RFQ input

Marking, traceability, packing, preservation and destination

08RFQ input

Required delivery date, shipment terms and approved-vendor constraints

Evidence

Sources and review

Project engineering documents and current governing standards supersede this general selection map.